Thorndale Community Centre Survey

Date

Approved in the 2019 Thames Centre budget is $2.8 million in order to design build a 15,000 square foot (based on budget estimates) community centre hall that will incorporate as many needs into a hall as required.

The "sketch" of this includes space for a:

  • Multi-use full sized gym that can also be used as a hall with stage (7000 sq ft)
  • Full service kitchen
  • Meeting room space(s) for community groups and rentals
  • Possible Seniors Care space
  • Possible Daycare space

The budget and space does not permit the ability to build an arena, a pool, etc. This is for a COMMUNITY CENTRE building only. I am looking for any feedback in regards to use of space, design considerations, etc that you have, through an online survey.

Thank you for your time and consideration,
Deputy Mayor Kelly Elliot