2026/27 – Catherine Street Watermain Replacement, Sidewalk Installation, and Storm Sewer Reconstruction
Construction Date: Anticipated June 2026 - December 2026, with remaining work completed in 2027
Scope: The project scope includes watermain replacement and upsizing from Shaw Road to St. David Catholic School, installation of sidewalks on the north side of Catherine Street from Shaw Road to the existing sidewalk network at Northdale Public School, installation of storm sewers adjacent to the sidewalk on the north side of Catherine Street, upsizing of the existing storm sewer on the south side of Catherine Street from Ruth Street to the outlet near 3581 Catherine Street, and concrete culvert extension at the Dorchester Conservation Area to facilitate sidewalk installation over the existing watercourse.
Contact Information:
Tanner Stanton
Municipality of Thames Centre
tstanton@thamescentre.on.ca
Tel: 519.268.7334 Ext. 235
Josh Smith, P.Eng.
Development Engineering (London) Limited
jsmith@deveng.net
519-672-8310 x113
Attachments
- Notice of Project Award - May 28, 2026
- Notice of Public Information Centre
- PIC Presentation
- PIC Drawings
- Comment page (No longer accepted, Deadline - March 2, 2026)