2025/26 – King Street Storm Sewer Upgrade and Road Urbanization (Pending Council Approval)

Image
Drawings of Road Work

Construction Date: Anticipated April 2026 (Pending Council Approval)

Scope: The project scope includes providing an urbanized design to Middlesex County Standards on King Street between Nissouri Road and Wye Creek Bridge. The design includes adjusting the elevation of King Street to encourage water flow towards the roadway (where possible), installation of curb and gutter, turn lane, 1.5m sidewalks with tactile plates at intersection, pedestrian crosswalk at Brooker Trail / Aspen Circle, and an upgraded Storm Sewer with Private Drain Connections to each property.

View Drawings

Public Information Centre Meetings

Thursday, June 26, 2025, 5:30 pm – 7:30 pm

Thorndale Lions Community Centre – Meeting Room #3

265 Upper Queen Street, Thorndale, ON N0M 2P0

PIC Presentation Slides

Leave a Comment

Leave a comment regarding this project through the button below:

Provide Feedback Here

 

Contact Information

Tanner Stanton, Engineering Technologist

The Municipality of Thames Centre
tstanton@thamescentre.on.ca
(519) 268-7334 ext. 235

After Hours Water Emergency Number: (519) 930-8118

WT Infrastructure Limited

https://www.wtinfrastructure.ca/